Larsen & Toubro Oman LLC | ||
Project | Mawellah Grid Station | |
Electrical Installation works at 132/33kV Mawellah Grid Station | ||
Ongoing Project | ||
Project | 132kV Mawellah Grid Station | |
132kV Cable Laying and Associated works from Mawellah to Seeb Grid Station | ||
Ongoing Project | ||
Project | 132kV Grid Stations at Sohar, Shinas and Buraimi | |
Electromechanical Installation works at 132kV Sohar, Shinas and Buraimi Grid Stations | ||
Ongoing Project | ||
Project | Al-Khalata and Al-Amin Grid Station | |
Electrical Installation works at 132/34.5kV Al-Khalata and Al-Amin Grid Stations | ||
Project Completed Successfully | ||
Project | SFZ and Awqad Grid Stations, Salalah | |
132kv Cable Laying works at SFZ and Awqad Grid Stations, Salalah | ||
Ongoing Project | ||
Project | Electrical works at JSIS, Sohar | |
Dismantling of Existing DB's and Installing New DB's in SMS Project Office at JSIS, Sohar | ||
Project Completed Successfully | ||
Project | 220kv Jahloot OHL Project | |
Installation of Conductor Lights, Aviation Warning Spheres, Spacers and Jumpering with Jumper Spacer in Tension Towers for 220kV Jahloot OHL Project | ||
Project Completed Successfully | ||
Project | Al-Hufri Primary Substation | |
Control Cable Termination Works at 33/11kV Al-Hufri Primary Substation | ||
Project Completed Successfully | ||
Project | 132kV OHL (Ibri-Dank) | |
Instalallation of 2nd Bottom Tower Warning Light in 132kV OHL (Ibri-Dank) | ||
Project Completed Successfully | ||
Project | MOD Primary Substation | |
Electromechanical Installation works at 33/11kV MOD Primary Substation | ||
Project Completed Successfully | ||
Project | Electrical Installation works at MC5, Salalah Airport | |
Electrical Installation works 132/11kV Grid Station & 132kV Cabling System for MC-5 Development of Salalah Airport | ||
Ongoing Project | ||
Project | 220kV Jahloot OHL | |
220kV Tower Erection and Tightening works for DS, D2, D6, D9 and DT with necessary Leg Extension and Body Extension | ||
Project Completed Successfully | ||
Project | Samail Grid Station | |
Transformer Dismantling and Reinstallation Works-132kV Transformer and associated Civil & Electro-mechanical works at Samail Grid Station | ||
Project Completed Successfully | ||
Project | Jahloot Grid Station | |
220kV and 132kV Cable Installation works at Misfah and Jahloot Grid Station | ||
Project Completed Successfully | ||
Project | 132KV Cable laying from Liwa GS to Arms SS, Sohar | |
Installation of 132KV 1CX300SQMM XLPE insulated cable from Liwa Grid Station to Arms 132/11KV SS at Sohar | ||
Project Completed Successfully | ||
Project | Shutdown works at Jalan Banu Bu Ali | |
Emergency works to carry out replacement of bushing for 132/33kv transformer and associated Civil & Electromechanical works at Jalan Banu Bu Ali Grid Station | ||
Project Completed Successfully | ||
Project | Wadi Kabir Grid Station Revamping | |
Revamping of Flash Over 33kV Incomer Panel at Wadi Kabir Grid Station | ||
Project Completed Successfully | ||
Project | New Sohar Grid Station | |
22kV Tower Assembly and Erection works at New Sohar Grid Station | ||
Project Completed Successfully | ||
Project | Upgradation of Existing Primary Substation at Mabela South-4 | |
Electrical & Mechanical Installation works at Mabela South-4 Primary Substation | ||
Project Completed Successfully | ||
Project | Civil works at Jahloot Grid Station | |
Civil works for upgrading of Jahloot Grid Station and associated 220KV OHL route from Barka to Misfah | ||
Project Completed Successfully | ||
Project | Jindal Shadeed Iron & Steel LLC, Sohar | |
Reinforcement Tying and EP (Anchors & Foundation Bolts), Shuttering and Concreting works | ||
Project Completed Successfully | ||
Project | New Sohar Power Grid Station | |
Electromechanical Installation and 220kV Cable Laying works at New 220kV Sohar Power Grid Staion | ||
Project Completed Successfully | ||
Project | Electrical works of Al-Ansab Primary Substation | |
Installation of Electrical Equipments and Mechanical works at 33/11KV Primary Substation at Al-Ansab | ||
Project Completed Successfully | ||
Project | Electromechanical works at 33/11kV Wali Office Primary Substation-Salalah | |
Electromechanical works at 33/11kV Wali Office Primary Substation-Salalah | ||
Project Completed Successfully | ||
Project | Installation and Erection of Electrical Equipments of 132kV Outdoor Switchyard at Ibri Grid Station | |
Installation and Erection of Electrical Equipments of 132kV Outdoor Switchyard at Ibri Grid Station | ||
Project Completed Successfully | ||
Project | Shutdown and 132kV Tower Dismantling works at Wadi Saa Grid Station | |
132kV Tower Erection, Stringing of New Conductors and Dismantling of exisiting 132kV Wooden Pole Line during Shutdown works at Wadi Saa Grid Station | ||
Project Completed Successfully | ||
Project | Majlis Primary Substation at Al-Bustan | |
Electromechanical Installation works at Majlis Primary Substation at Al-Bustan | ||
Project Completed Successfully | ||
Project | Sahal Noot Primary Substation | |
Electromechanical Installation works at Sahal Noot Primary Substation at Salalah | ||
Project Completed Successfully | ||
Project | 220/132Kv OHL-Ibri Dank | |
220/132kV Tower Installation works including Ground Assembly, Erection and Tightening of Towers at Ibri-Dank | ||
Project Completed Successfully | ||
Project | Construction of Primary Substation at Al Ansab | |
Construction of 2x20 MVA ,33/11kv Primary Substation building at Al Ansab . | ||
Project Completed Successfully | ||
Project | 33KV OHL Survey works at Daleel Oilfields | |
Survey and Profile preparation for 35KM of OHL at Daleel Oilfields | ||
Project Completed Successfully | ||
Project | Civil Construction at 3x20MVA 33/11.5kV Jibroo Primary Substation | |
Civil Construction of Aux.Transformers and RMU Foundations at 3x20MVA 33/11.5kV Jibroo Primary Substation | ||
Project Completed Successfully | ||
Project | Foundation for 220kV OHL Towers at Ibri-Dank | |
Civil Construction of Foundation for 220kV OHL Towers | ||
Project Completed Successfully | ||
Project | Tower Erection works at Wadisa, Buraimy | |
132 kV Tower Erection works at Al Wasit , Buraimy . | ||
Project Completed Successfully | ||
Project | Electromechanical works at IWPP & SFZ Grid Stations, Salalah | |
Installation of 132KV SF6 Gas Insulated Switchgear (GIS) with Local Control Panel (Including LLC to bay, control cabling and termination), Installation of 132/33KV, 125MVA Transformer with RTCC Panel, Cable Laying for Two 132Kv Cable Circuits, Consisting of 6 Runs (2x3), 1Cx2500sqmm XLPE Insulated Copper Cables from SFZ GIS Terminals to 132KV Gantry (NPS 1&2), Cable Laying for Two 132KV Cable Circuits Consisting of 6 Runs (2x3), 1Cx800sqmm XLPE Insulated Copper Cables from SFZ GIS Terminals to 132KV Terminals in 125MVA Transformers 1& 2, Installation of 132KV Control Panel, 132KV Relay Panel, 132KVBusbar Protection Panel, 33/0.415KV, 750KVA Earthing Auxiliary Transformer, neutral earthing Resistor, 33KV Switchgear, 33KV Control Panel, 33KV Relay Panel, 33KV Busbar Protection Panel. Fabrication of Supports and Fixing of Fire Hose Cabinet with Fire Hose and Complete. Fixing of Fire hydrant 6” Wet type with Isolation Gate Valve. Installation of EOT Crane | ||
Project Completed Successfully | ||
Project | OHL works at Blue City, Barka | |
Tower Foundation work for 220KV Transmission Line and 220KV Transmission Erection works | ||
Project Completed Successfully | ||
Project | OHL Works at Bowsher | |
Shutdown and OHL Dismantling works at Bowsher | ||
Project Completed Successfully | ||
Project | Cable Laying at Misfah Grid Station | |
Laying of 12Runs of 132KV 1Cx2500Sqmm Cable from Outdoor Cable Sealing End to 132KV GIS Cable Cellar | ||
Project Completed Successfully | ||
Project | Installation of 132kV GIS, 33kV GIS and Assembly Transformers at Saham Grid Station | |
Installation of 132kV GIS, 33kV GIS and Assembly Transformers at Saham Grid Station | ||
Project Completed Successfully | ||
Project | Duqm Cable Laying Project | |
33 kV Cable Laying Work up to 200 km ( Approx.) Related Cable Termination for Distribution Network at Duqm. | ||
Project Completed Successfully | ||
Project | Quram Cable Laying | |
33 KV Cable laying | ||
Project Completed Successfully | ||
Project | North Awqad 33/11 Kv Primary Substation , Salalah | |
Electrical Installations related to 33kV/11 kV Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | 33kV Primary Substations at Duqm 6 Nos | |
Electrical Installations related to 33kV Substation and other Electrification Works | ||
Project Completed Successfully | ||
Project | Al-Hail North 33/11kV Primary Substation | |
Electrical Installations related to 33kV/11 kV GIS Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Airport Heights Substation | |
Electrical Installations related to 33kV/11 kV GIS Substation and other Electrification Works . & Fire Fighting works | ||
Project Completed Successfully | ||
Project | Capacitor Bank Foundation works at Bowsher, mabella, mawella , MSQ,Jalooth | |
Construction of Capacitor bank foundations , cable laying ,installation and all electrical works . | ||
Project Completed Successfully | ||
Project | OOT- Sohar Oil & Storage Tanking farm Project. ( Phase - 3 ,Phase - 4) | |
Industrial wiring and Lighting installation, fabrication and installation of supports for cable trays, Lighting &power and Instrumentation (including tubing an all) works. cable laying and termination of all electrical and instrumentation works. installation of Electrical (including 3nos 6.6kV/415v substations)& Instrumentation Equipments in 8 Tank pits, 2product pump house and 3berths. | ||
Project Completed Successfully | ||
Project | Aziaba 132/33 kV GIS Sub Station | |
Electrical Installations related to 132kV /33 kV GIS Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Quram Heights Primary Substation | |
Electrical Installations related to 33kV/11 kV GIS Substation and other Electrification Works | ||
Project Completed Successfully | ||
Project | Digital T.V Studio primary Substation | |
Electrical Installations related to 33kV/11 kV GIS Substation and other Electrification Works | ||
Project Completed Successfully | ||
Project | Civil Engineers Supply Basis | |
Supplying of Civil Engineer for various civil executions inside OMAN. | ||
Project Completed Successfully | ||
Building Supplies & Services Co.LLC., | ||
Project | Construction of Workshop & Labour camp including electrical works at Barka | |
Construction of work shop & Labor camp . | ||
Project Completed Successfully | ||
Galfar Engineering & Contracting S.A.O.G., | ||
Project | Upgrading of Mudhaibi, Rustaq and Izki Grid Stations | |
Installation of 132 / 33kV, 125MVA Transformer Accessories including Oil Filtration works at Mudhaibi, Izki and Rustaq Grid Stations | ||
Project Completed Successfully | ||
Project | Electro Mechanical Installation at Ghala Grid station | |
Electro Mechanical Installation at Ghala 132 / 33 kV Grid Station | ||
Ongoing Project | ||
Project | Installation of 132 kV Cables & FOC etc., between Ghala to Airport Grid Stations | |
Carryout Laying 2 Circuits of 132kV 1Cx2500Sqmm XLPE Insulated Copper Cable, Laying and Fixing of 2 runs of 6 Fibre Temperature Sensing Cable, Fibre Optic Cable alongwith 50mm UPVC Pipe in buried cable trench from proposed Ghala Grid Station to Airport Grid Station | ||
Ongoing Project | ||
Project | National Heart Centre, Royal Hospital Oman | |
Cable Termination works at National Heart Centre, Royal Hospital Oman | ||
Project Completed Successfully | ||
Project | Qaboos Cardiac Centre, Salalah | |
Electrical & Mechanical Installation works in Qaboos Cardiac Centre, Salalah | ||
Project Completed Successfully | ||
Project | Al-Ameen Mosque, Bausher | |
Carryout Laying, Glanding and Termination of Incoming LV Cables | ||
Project Completed Successfully | ||
Project | Upgrading of Izki Grid Station | |
Installation of 132kV & 33kV Indoor Type CRP Panel, 33kV AIS, Fabrication of Cable Tray, Control Cabling and Termination of Control Cables | ||
Project Completed Successfully | ||
Project | Upgrading of Izki, Mudhaibi and Rustaq Grid Stations | |
Carryout De-gassing, Vaccumig, Filtering of Oil for 125MVA Transformer Main Tank without fixing Accessories at Izki, Mudhaibi and Rustaq Grid Stations | ||
Project Completed Successfully | ||
Project | Laying of 132KV XLPE Cable and FOC cable in Trench from Muttrah Substation to Terminal Tower | |
Laying of 132KV 1Cx2500sqmm XLPE Cable in Trench (2x3x3.4KM), Laying of 24F Single Mode Fibre Optic Cable and 50mm UPVC Pipe (2x3.4KM) from Muttrah Substation to Terminal Tower (AP 21) near the Friday Market | ||
Project Completed Successfully | ||
Project | Vale 132 kV Cable Laying at Sohar | |
132 KV Cable Laying of 15 kms for Vale Steel Plant. | ||
Project Completed Successfully | ||
Project | Fencing works at Airport Heights-3 Primary Substation | |
Supply and Installation of Wooden Fencing, Consruction of Worker's rest shed, Worker's toilet and installation of Portacabins at Airport Height Substation Project Site | ||
Project Completed Successfully | ||
Project | New Villa at Alam Heights | |
Carryout Cable laying, jointing and termination of LV cables, laying of 11KV HT cable with Caution Tape | ||
Project Completed Successfully | ||
Project | Barka Water Reservoir Pumping Station | |
Carryout 11kV Cable Laying, Testing and Commissioning, Conductiing, HV Testing for 2Nos at Barka Water Reservoir Pumping Station | ||
Project Completed Successfully | ||
Project | Oman Botanical Garden Primary Substation at Al-Khoudh | |
Civil Construction of 2Nos of 33kV Tower Foundations at Oman Botanical Garden Primary Substation at Al-Khoudh | ||
Project Completed Successfully | ||
Project | 11kV Cable Laying works from Barka Reservoir Pump to Barka Power Plant Grid Station | |
11kV Cable Laying works from Barka Reservoir Pump to Barka Power Plant Grid Station | ||
Project Completed Successfully | ||
Project | Construction of Inline Gantry Foundations at Mutrah Grid Substation | |
Construction of Inline Gantry Foundations at Mutrah Grid Substation | ||
Project Completed Successfully | ||
Project | Construction of Cable Tunnel at 132/33KV MSQ Grid Station | |
Carry out Construction of Cable Tunnel and Installation of Fence alongwith Associated Civil Modifications at 132/33KV MSQ Grid Station | ||
Project Completed Successfully | ||
Project | Erection of Steel OHL Towers at Saihraw-Barik-Sahmah OHL Route | |
Segregate, Assemble & Erection of Steel OHL Towers at Saihraw-Barik-Sahmah OHL Route including application of reflective paint | ||
Project Completed Successfully | ||
Project | OHL Works at Walja ,Mawalleh C,Sur AL Hadeed Rusayl | |
OHL Shut down works , Transformer Erection and Transformer shifting , Cable laying Etc. | ||
Project Completed Successfully | ||
Project | Sur Al Hadid 33/11kV Primary Substation | |
Electrical Installations related to 33kV/11 kV Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Mawalleh - C 33/11kV Primary Substation | |
Electrical Installations related to 33kV/11 kV Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Rusayl 33/11kV Primary Substation | |
Electrical Installations related to 33kV/11 kV Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Ghala 33/11kV Primary Substations | |
Electrical Installations related to 33kV/11 kV Substation and other Electrification Works . | ||
Project Completed Successfully | ||
Project | Ghala Primary Substation | |
Civil Construction of Substation building, Transformer Foundation and cable trenches at Ghala | ||
Project Completed Successfully | ||
Project | Rusayl Primary Substation | |
Civil Construction of Substation building, Transformer Foundation and cable trenches at Rusayl | ||
Project Completed Successfully | ||
Civil Contracting Co.LLC (Civil Co.) | ||
Project | Laying of 132KV XLPE Insulated route cables in Buraimi Area | |
Laying of 132KV 1Cx2500Sqmm XLPE Cable (3 Runs Per Circuit), 50MM UPVC Pipe, FO Cable, 300Sqmm Earth Boring, Concrete Tiles, Pre-padding / Backfilling with Soft Sand,Week Mix and Imported Filling Material | ||
Project Completed Successfully | ||
Project | 220 kV Cable Laying of Third and Fourth Circuits at Barka | |
220 kv cable Laying of Third and fourth Circuits and including all Civil works . | ||
Project Completed Successfully | ||
Remcon Electrical Co.LLC., | ||
Project | Cable Laying at sohar | |
220 KV Cable Laing at Sohar Aluminiuum Smelter at Sohar | ||
Project Completed Successfully | ||
Siemens LLC., | ||
Project | Fabrication works at various Grid Stations | |
Structure Modification works at various Grid Substations in Muscat | ||
Project Completed Successfully | ||
Project | 132 kV Gis Installation works for 7 Substations at Wadi Saa, Misfah, Yitti, Muttrah, Yitti, Qurum & Seeb and 132kV AIS Installation works for Jahloot Substation | |
Manpower Supply for GIS Installation , Transportation of GIS Materials , Installation of Site Office facility | ||
Project Completed Successfully | ||
Oman National Engineering & Investment Co SAOG., | ||
Project | Mutrah Primary Substation | |
Electromechanical works-Mutrah Primary Substation | ||
Project Completed Successfully | ||
Project | Royal Hosptial Primary Substation | |
Electromechanical Installation of Electrical Equipments and Laying & Termination of Power & Control Cables at Royal Hospital Primary Substation | ||
Project Completed Successfully | ||
Project | Civil Construction of Upgradation of 33/11kV Mutrah 1 Primary Substation from 2x16MVA to 2X20MVA | |
Civil Construction of Upgradation of 33/11kV Mutrah 1 Primary Substation from 2x16MVA to 2X20MVA | ||
Project Completed Successfully | ||
Project | Installation of CTs and Laying Control Cables to 33kV Switchgears in 46 OETC Grid Stations in Oman | |
Installation of CTs and Lay Control Cables to 33kV Switchgears, Installation of Meters and Connecting the CT & VT in 46 OETC Grid Stations in Oman | ||
Project Completed Successfully | ||
Project | Laying of Power & Control Cables with Termination at 33/11kV Al-Khoudh Primary Substation | |
Laying of Power & Control Cables with Termination, Glanding, Ferruling & Tagging and Erection of Power & Control Cable Trays at 33/11kV Al-Khoudh Primary Substation | ||
Project Completed Successfully | ||
Project | Al Madina Primary substation at Bhuraimi | |
Electrical Installation works related to 33/6.6 k V Substation and other electrical works. | ||
Project Completed Successfully | ||
Bahwan Engineering Co LLC., | ||
Project | MSQ Grid Station, Muscat | |
Transformer Foundations & Associated Civil works | ||
Project Completed Successfully | ||
Larsen & Toubro Electromech LLC., | ||
Project | SMS-Electro-Instrumental Erection works at JSIS, Sohar | |
Electrical works (Erection, Testing & Commissioning) and Cable Laying and Termination works | ||
Project Completed Successfully | ||
Project | Cable Laying works in Qarnalam | |
Cable Laying works in North Oman PDO Locations | ||
Project Completed Successfully | ||
Project | Independent Water & Power Project Salalah | |
Electrical and Instrumentation Installation works at IWPP, Salalah | ||
Project Completed Successfully | ||
Project | Electrical Execution works at OOT PH 4&5 at Sohar Port, Oman | |
Installation of MV/LV Switchgear Panels, Lighting, Wiring, Cable Laying, Dressing Including Tagging, Cable Termination, Cable Tray & Trunk Installation | ||
Project Completed Successfully | ||
Project | Electromechanical Erection works for Pelletizing Plant at Sohar for Vale | |
Electromechanical Erection works for Pelletizng Plant at Sohar for Vale | ||
Project Completed Successfully | ||
Project | Electrical execution works in OOT-PH-6, Sohar Port, Oman | |
Electrical execution works in OOT Phase-6, Sohar Port, Oman | ||
Project Completed Successfully | ||
Project | PTTEP Myanmar Zawtika Wellhead Platforms-L&T MFY | |
Electrical Installation works at L&T MFY Yard, Sohar | ||
Project Completed Successfully | ||
Project | Foundation Blocks Pre-Casting | |
Pre-casting of Sign Board Foundations in North Oman PDO-Location | ||
Project Completed Successfully | ||
Mustafa Sultan Electronics Co LLC., | ||
Project | Electrical works at GOB-Qurum | |
Installation, Termination of Red Switch (RS), Cabling of Power Cable and Termination and Termination of 3Cx2.5Sqmm Cable | ||
Project Completed Successfully | ||
Mustafa Sultan Security & Communication Systems Co LLC., | ||
Project | Power & Control Cabling for Motorised Curtains System at Royal Opera House-Muscat | |
Power & Control Cabling for Motorised Curtains System at Royal Opera House-Muscat | ||
Project Completed Successfully | ||
Project | Security System Installation works at ISS Qurum Office | |
Security System Installation works at ISS Qurum Office | ||
Project Completed Successfully | ||
Al Madina Cement Company LLC., | ||
Project | Indoor and Outdoor Electrical works for Main Susbtation of Al-Madina Cement Company LLC, Al-Buriami | |
Indoor and Outdoor Electrical works for Main Susbtation of Al-Madina Cement Company LLC, Al-Buriami | ||
Project Completed Successfully | ||
ABB LLC., | ||
Project | 132/33KV Rustaq Grid Station | |
Installation of 132/33KV MVA Transformer Accessories with Oil Filtration Works | ||
Project Completed Successfully | ||
Project | 132/33KV Barka Grid Station | |
Replacement of valves of New 132/33KV MVA transformers at Barka Grid Station | ||
Project Completed Successfully | ||
Project | Installation of 33KV & 6.6KV Switchgear at Oman Cement Company's Rusayl Substation | |
Installation of 33KV & 6.6KV Switchgear at Oman Cement Company's Rusayl Substation | ||
Project Completed Successfully | ||
Gam & Partners LLC., | ||
Project | Construction of 132KV OHL in Bausher Area | |
Construction of 132KV OHL in Bausher Area | ||
Project Completed Successfully | ||
Voltamp Power LLC., | ||
Project | Sohar Industrial Area | |
Installation of Copper Bus Bar and 110kV Isolators and Support Insulators at Sohar Industrial Area | ||
Project Completed Successfully | ||
VA Tech Wabag Ltd., | ||
Project | Duqm Desalination Plant, Duqm | |
Erection Testing and Commissioning of Transformer at Duqm Desalination Plant, Dqum | ||
Project Completed Successfully | ||
Saudi National Contracting Company LLC., | ||
Project | 33 kV U/G Cable Laying from Khasba ( Musandam Governorate) Grid Stattion to OHL Terminal | |
Laying of 6 Sets of U/G 33 kV Cables ( 18 # 1coreX500 Sqmm in Trefoil Formation) from SNCC's 132/33 kV Grid Station End over a 10 kM Route to OHL Terminal Towers, including Indoor / Outdoor & Straight Thru Terminations. | ||
Ongoing Project | ||
Project | New 132/33 kV Grid Station at Dibbah, Musandam Governorate | |
Civil Construction site of SNCC's 132/33 kV Grid Station for RAECo at Dibbah | ||
Ongoing Project | ||
Project | New 220kV Barka and Misfah Grid Station and Installation of Required OHL | |
Civil and Installation works at Misfah-Barka UG Cable Route | ||
Project Completed Successfully | ||
Project | Replacing Portions of 220kV & 132kV OHL in Muscat Governorate with Cables Ph-1 Part-3 | |
Construction of RCC Back Wall for Tunnel Works | ||
Project Completed Successfully | ||
Project | New 220kV Barka and Misfah Grid Station and Installation of Required OHL | |
Electromechanical works-Barka Grid Station | ||
Project Completed Successfully | ||
Project | New 220kV Barka and Misfah Grid Station and Installation of Required OHL | |
220kV Cable Installation works-Barka GS to Falyj GS | ||
Project Completed Successfully | ||
Project | Construction of Sur 220KV Grid Station and associated transmission line between Sur and Jahloot | |
Electromechanical installation works in Sur 220KV Grid Station | ||
Project Completed Successfully | ||
Project | New 220KV Misfah and Barka Grid Station and Installation of required OHL | |
Construction of Cable Joint Pit and Link Box works from Barka to Misfah | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Construction of Tunnel Extension works at Under Ground Cable Project at Barka | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Electrical & Mechanical Installation works in Misfah 220kV Grid Station | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Civil Construction of Boundary Wall at Barka | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Civil Construction of Bus Bar Duct Foundation, Gantry Foundation, SA & CSE Foundations and Modification of Existing Gantry Foundations at Misfah Grid Station | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Supplying of Precast Earth Chamber with Cover Slab at Barka | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Civil Miscellaneous works at Barka Grid Station | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
Construction of Tarmac Road at 220kV Misfah Grid Station | ||
Project Completed Successfully | ||
Project | Construction of Sur 220kV Grid Station and Associated Transmission Line between Sur and Jahloot | |
400kV Tower Gantry works at Jahloot Grid Station | ||
Project Completed Successfully | ||
Project | New 220kV Misfah and Barka Grid Station and Installation of Required OHL | |
LILO OHL works at 220kV Misfah Grid Station | ||
Project Completed Successfully | ||
Project | Mawellah Grid Station | |
Earthing works Inside Maellah GSS for AHS Feeder | ||
Project Completed Successfully | ||
Project | Replacing Portions of 220kV & 132kV OHL in Muscat Governorate with Cables Ph-1 Part-3 | |
Construction of RCC Duct Bank for Airport Heights to Seeb Main Feeders | ||
Project Completed Successfully | ||
Project | Replacing Portions of 220kV & 132kV OHL in Muscat Governorate with Cables Ph-1 Part-3 | |
Civil works at Mawellah Grid Station for Rusayl Mawellah Feeders | ||
Project Completed Successfully | ||
Eastern Power United LLC., | ||
Project | Construction of Inernal Roads at Bousher Phase-4 | |
Removal and Reinstallation of Street Light Poles at Bousher Area | ||
Project Completed Successfully | ||
Nagarjuna Construction Company International LLC., | ||
Project | Sohar Industrial Port Area | |
Laying and Installation of 33kV, FO & Pilot Cables in all aspects for Production of Process Water for Sohar Industrial Port Area | ||
Project Completed Successfully | ||
Project | Sohar Industrial Port Area Desalination Plant | |
Installation, Termination, Testing & Commissioning of Electrical and Instrumentation works in All Buildings and Inside Plot | ||
Ongoing Project | ||
Oman Electricity Transmission Company SAOC., | ||
Project | Shut Down Work at Buraimi | |
Determining the cable Fault location, Rectification of the fault and doing HV Test after rectification. | ||
Project Completed Successfully | ||
Project | Old Cable dismantling at Seeb Grid Station | |
Removing old unwanted cable at Seeb Grid Station and handing over to OETC Stores | ||
Project Completed Successfully | ||
Project | Various OETC Grid Stations | |
Providing Service of Protection Specialist Engineer for Relay Configuration Verification and Scheme Check | ||
Project Completed Successfully | ||
Project | Testing works in Various OETC Grid Stations | |
Modification works in existing Control/Protection Scheme for introducing Cross Tripping System in Various OETC Grid Stations | ||
Project Completed Successfully | ||
Special Technical Services LLC., | ||
Project | Amal on Plot Steam Facilities Project | |
Electrical & Instrument Associated works at Amal | ||
Project Completed Successfully | ||
Project | Mina Al-Fahal Primary Substation | |
Civil Construction Primary Substation Building at Mina Al-Fahal (PDO) | ||
Ongoing Project | ||
Silver Vision Services LLC., | ||
Project | 132kV Wadi Adai Grid Station | |
Carrying out 132kV Cable Laying works | ||
Project Completed Successfully | ||
International Electrical Company (Oman) LLC., | ||
Project | Majlis Oman | |
Cable Laying works for 4Cx185mm2 & 4Cx240mm2 Cable | ||
Project Completed Successfully | ||
G S Neotek LLC., | ||
Project | Sohar II IPP | |
Installation of Isolated Phase Duct from Generator to Generator Circuit Breaker and from Generator Circuit Breaker to Generating Transformer | ||
Project Completed Successfully | ||
Project | Sohar II IPP | |
LV Power and Control Cable Laying, Termination Works and GI Conduiting | ||
Project Completed Successfully | ||
Project | Sohar II IPP | |
Punch List Attending and Clearing of I&C and Electrical Punch List with A, B, C Priority | ||
Project Completed Successfully | ||
Agnice International & Partners LLC., | ||
Project | MC-5 Development of Salalah Airport | |
Installation of Fire Alarm and Detection System Equipments at MC-5 Development of Salalah Airport | ||
Project Completed Successfully | ||
Al Wataniya United Engineering & Contractic Co. LLC., | ||
Project | Electrical Equipment Installation at Duqm Port | |
Electrical Equipment Installation for Primary Substation at Duqm Port | ||
Ongoing Project | ||
Project | Electrical Equipment Installation at Khasab | |
Electrical Equipment Installation at 33 kV/ 11 kV, 2x50 MVA Primary Substaion at Khasab, Musandam Governorate | ||
Ongoing Project | ||
Project | Construction of 33/11kV, 2x20MVA Primary Substation at Al-Husn II, Salalah | |
Electromechanical Installation works at 33 /11 kV, 2x20 MVA, Al-Husn II Primary Substation in Salalah | ||
Project Completed Successfully | ||
Project | Upgrading of Thumrait Substation, Salalah | |
Laying of Control Cables (different sizes), Glanding and Termination of 2 Nos 20MVA Transformer at 33/11kV Thumrait Substation, Salalah | ||
Project Completed Successfully | ||
Ozdil Energy Resources LLC., | ||
Project | New 220/132kV Wadi Adai Grid Station and Associated Transmission Line | |
132kV UG Cable Laying works at Jahloot | ||
Project Completed Successfully | ||
Oman United Engineering Services LLC., | ||
Project | Construction of Internal Roads at Bausher Phase-4 | |
Dismantling of OHL Line and Laying 11kV Cables | ||
Project Completed Successfully | ||
M/s Al Watanyiah Untied Engineering & Contracting Co LLC., | ||
Project | Construction of 33/11kV, 2x20MVA Primary Substation at Al-Husn II | |
Electromechanical Installation works at Al-Husn II Primary Substation | ||
Ongoing Project | ||
Hyundai Engineering Co. Ltd., | ||
Project | Specialised Manpower for Musandam Gas Project Electicals. | |
Supply of Specialised Man Power for Electrical installation work at Musandam Gas Plant (MGP) | ||
Ongoing Project | ||
Oil Tanking Odfjell Terminal & Co. ( OOTO)., | ||
Project | Mechanical Fabrication for OOTO at Sohar / Muscat | |
Deputation of skilled Manpower for Mechanical Fabrication for OOTO Projects at Sohar / Musca | ||
Ongoing Project | ||
Arabian Industries Projects (AIP )., | ||
Project | Al Ayjah - Grid Station of AIP | |
Electro-Mechanical Installation at 132 kV Grid Station, Al Ayjah | ||
Ongoing Project | ||
International Water Treatment LLC ( IWT)., | ||
Project | Independent Water Project at Al Ghubrah, Muscat for IWT | |
Civil Construction of Electrical Building -1 ( EB-1) | ||
Ongoing Project | ||